Sample build A demonstration site for Weblink Design. Placeholder Construction Co. is not a real company — the business, phone number and reviews below are fictional.

Bathroom remodeling in Dothan, AL

A bathroom is the smallest room in the house and the least forgiving. Waterproofing done to spec, a floor sloped to the drain, tile set straight, and a fan that actually moves air — get those right and the finishes take care of themselves.

Our approach

The parts you never see are the ones that fail

Nearly every bathroom we tear out failed the same way: water got behind the tile because the waterproofing was skipped or short-cut. We install a full waterproof membrane system, flood-test pans before tiling, and vent the exhaust fan outside the building rather than into the attic. It is not glamorous. It is why the work lasts.

2–4Typical weeks
25Years building
1Crew, start to finish
2Week average wait
A finished walk-in tiled shower in a remodeled Dothan bathroom
Scope

What a bathroom remodel with us includes

Tub-to-shower conversions

The most requested job we do — trade a tub nobody uses for a shower you use every day.

  • Drain relocated and floor re-sloped
  • Niche, bench and glass panel
  • Usually finished in about two weeks

Curbless & accessible

Zero-threshold showers planned properly, not retrofitted after a fall.

  • Recessed pan set into the joists
  • Blocking for grab bars now or later
  • Comfort-height fixtures, wider doorways

Full gut remodels

Down to the studs and subfloor when the plumbing is original and the layout no longer works.

  • New supply and drain lines
  • Fixture relocation and new venting
  • Subfloor repaired or replaced

Waterproofing & tile

Membrane system behind every wet wall, pans flood-tested, tile laid out from a centre line.

  • Bonded waterproof membrane, not just backer board
  • Flood test before tile goes on
  • Straight grout lines and sealed corners

Vanities & storage

Real storage sized to the room, with the plumbing rough-in set to match the vanity you actually chose.

  • Single and double vanities
  • Linen towers and recessed niches
  • Solid-surface and quartz tops

Ventilation & lighting

Moisture leaves the room or it ends up in the ceiling. We size the fan and duct it outside.

  • Fan sized to room volume, ducted to exterior
  • Damp-rated shower lighting
  • Vanity lighting that is not a shadow machine
What to expect

How a bathroom remodel runs

Short schedules, but the sequence still matters — cure times are not negotiable.

  1. Consultation

    We look at the existing plumbing, the subfloor, and how the room is vented, then talk budget before anyone picks a tile.

  2. Written estimate

    Line-item pricing with written allowances for tile, fixtures, glass and vanity, plus what is excluded.

  3. Timeline

    Dated milestones for demolition, rough-in, inspection, waterproofing, tile, and finish — including which days the bathroom is unusable.

  4. Change orders

    Priced and signed before work proceeds. In bathrooms the usual surprise is rotted subfloor or old cast-iron drain; you hear the day we find it.

  5. Communication

    One project lead by phone or text, plus an end-of-week update on progress and decisions we need from you.

  6. Walkthrough & warranty

    Punch list closed on site, caulk lines checked, fixtures demonstrated, and workmanship warranted in writing.

Recent bathrooms

Bathrooms we have remodeled around Dothan

Questions

Bathroom questions we get every week

How long does a bathroom remodel take?

A tub-to-shower conversion runs about two weeks. A full gut with new plumbing runs three to four. Tile and waterproofing have cure times we do not rush, and that is usually what sets the schedule.

Can I convert my tub into a walk-in shower?

Yes, and it is one of the most requested jobs we do. The drain moves, the floor is re-sloped, and the walls are waterproofed before any tile goes on. If you want a curbless entry we check the floor joists first to confirm the recess is possible.

Will you make the bathroom accessible for aging in place?

We build curbless showers, install blocking in the walls for grab bars now or later, widen doorways where framing allows, and set comfort-height fixtures. Planning it during the remodel costs a fraction of retrofitting it afterwards.

This is our only bathroom — can we still do it?

Yes. We sequence the work to shorten the days without a working toilet and tell you those exact dates before demolition. We do not open up a single-bath house without a plan for it.

What does a bathroom remodel cost?

It comes down to whether fixtures move, how much tile is involved, and the condition of what is behind the walls. We walk the room and give you a free written line-item estimate rather than a number over the phone.

Free estimate

Ready to talk about your bathroom?

Four questions, about thirty seconds. We will call you back to set up a walkthrough and get you a written, line-item estimate — no pressure, no charge.

Prefer to talk now?
(334) 555-0142
Office hours
Mon-Fri 7am-5pm
Serving
Dothan, Enterprise and Ozark

We use your details only to prepare your estimate. No spam, and we never sell your information.

Call (334) 555-0142 Free estimate